当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:钢筋绑扎完毕后,应根据工艺进行预埋管件焊接于墙板钢筋上。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
钢筋绑扎完毕后,应根据工艺进行预埋管件焊接于墙板钢筋上。
问题补充:

  • 匿名
2013-05-23 12:21:38
After the steel banding should be based on embedded technology of steel pipe welded to the wall.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
After the steel bar binds finished, should carry on according to the craft buries the fitting welding in advance in the wall plate steel bar.
  • 匿名
2013-05-23 12:26:38
Reinforced binding after the embedded according to process on steel tubes welded to wall plate.
  • 匿名
2013-05-23 12:28:18
After the steel banding should be based on embedded technology of steel pipe welded to the wall.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭