当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:中间部分交叉点可相隔交错扎牢,但必须保证受力钢筋不位移。双向主筋和钢筋网,则须将全部钢筋相交点扎牢。绑扎时应注意相邻绑扎点的铁丝扣要成八字形,以免网片歪斜变形。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
中间部分交叉点可相隔交错扎牢,但必须保证受力钢筋不位移。双向主筋和钢筋网,则须将全部钢筋相交点扎牢。绑扎时应注意相邻绑扎点的铁丝扣要成八字形,以免网片歪斜变形。
问题补充:

  • 匿名
2013-05-23 12:21:38
Intersection of the middle part of the cross bar can be separated by prison, but must ensure that no displacement of the reinforced. Two-way steel mesh reinforcement and are required to fasten all reinforced the point of intersection. Lashing lashing points should pay attention to the wire adjacent
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The middle partial intersections may be separated by interlock grip the jail, but must guarantee the working reinforcement does not move.Bidirectional main reinforcement and mat reinforcement, then must grip the complete steel bar crossing point the jail.Binds when should pay attention binds the har
  • 匿名
2013-05-23 12:26:38
Middle section crossing point can be staggered away tie in prison, but must be guaranteed effective bar displacement. Bi-directional main reinforcement and steel bar mesh, all reinforced point of intersection shall be tied in prison. Attention in assembling adjacent binding wire bail into eight glyp
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭