|
关注:1
2013-05-23 12:21
求翻译:After a comprehensive evaluation was done, we used type formworks for the cone and the spiral water course bottom plate, and lifted them after they were assembled on site,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
After a comprehensive evaluation was done, we used type formworks for the cone and the spiral water course bottom plate, and lifted them after they were assembled on site,
问题补充: |
|
2013-05-23 12:21:38
综合评价后,我们用于锥螺旋水道底板类型formworks,并解除他们后,他们在现场组装,
|
|
2013-05-23 12:23:18
之后是做一个全面评价,我们用金属模板类型的锥体和课程的水循环底板,及取消后他们他们集中在现场,
|
|
2013-05-23 12:24:58
在一个全面评估完成之后,我们为锥体和螺旋水路线主夹板使用了类型模板和举他们,在他们在站点之后被装配了,
|
|
2013-05-23 12:26:38
综合评价工作完成后,我们类型模板用于锥和螺旋水课程底板和解除他们后他们聚集在网站上,
|
|
2013-05-23 12:28:18
综合评价后,我们用于锥螺旋水道底板类型formworks,并解除他们后,他们在现场组装,
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区