当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:由于今天香港挂8号风球,今天所有的ORDER都操作不了,全部要推迟到明天操作,所以明天此单车辆到达时间会稍晚一点是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于今天香港挂8号风球,今天所有的ORDER都操作不了,全部要推迟到明天操作,所以明天此单车辆到达时间会稍晚一点
问题补充:

  • 匿名
2013-05-23 12:21:38
As today in Hong Kong No. 8 typhoon signal, are operating today, not all of the ORDER, all operations should be postponed until tomorrow, so tomorrow, this one a little later the vehicle arrival time
  • 匿名
2013-05-23 12:23:18
Thanks to today Hong Kong typhoon signal No. 8 Today, all of which cannot be operated, all ORDER put off until tomorrow, tomorrow the single vehicle operation time of arrival will be later point
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Today, hanging 8th Hong Kong Typhoon, today all the ORDER operation can not, all to be put off until tomorrow the operation, so this single vehicle arrival time tomorrow could be a bit late
  • 匿名
2013-05-23 12:28:18
As today in Hong Kong No. 8 typhoon signal, are operating today, not all of the ORDER, all operations should be postponed until tomorrow, so tomorrow, this one a little later the vehicle arrival time
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭