当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:针对在设计时未考虑吊杆更换的吊杆拱桥,在吊杆锈蚀损害需要进行吊杆更换时,为避免破坏拱肋结构及解决吊杆在拱肋和横梁位置所采用的抱箍锚固系统,以新昌城西大桥为例,对抱箍结构的受力性能及疲劳构造进行分析。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
针对在设计时未考虑吊杆更换的吊杆拱桥,在吊杆锈蚀损害需要进行吊杆更换时,为避免破坏拱肋结构及解决吊杆在拱肋和横梁位置所采用的抱箍锚固系统,以新昌城西大桥为例,对抱箍结构的受力性能及疲劳构造进行分析。
问题补充:

  • 匿名
2013-05-23 12:21:38
Not taken into account in the design for the boom boom arch replacement, rust damage in the boom boom needs replacement, in order to avoid damage to the rib structure and solve the boom in the rib and beam position hoop used in anchoring systems, Xinchang west to the bridge, for example, the structu
  • 匿名
2013-05-23 12:23:18
In response, do not take into account in the design of Derrick replacement derrick arched bridge, the derrick rust and corrosion damage when needed, in order to avoid damage derrick replacement arch rib structure and resolve derrick in Arch rib and beam location used by tensioning system, with a vie
  • 匿名
2013-05-23 12:24:58
In view of when design had not considered the suspension bar replaces the suspension bar arched bridge, needs to carry on when the suspension bar corrosion harm the suspension bar replaces, is avoids destroying the arch rib structure and the solution suspension bar holds the band anchor system which
  • 匿名
2013-05-23 12:26:38
At design time is not considered the boom arch bridge Suspender replacement, Suspender corrosion damage when the need for Suspender replacement, to avoid destruction of arch rib structures and their boom in the arch and beam anchorage system of locations used in Hoop, new Changsong to West Bridge, f
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭