当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Debris filters device installed in the circulating water inlet, the debris which with circulating water into and effective diameter is greater than the diameter of the Debris filter hole was blocked on the filter mesh. After the mesh revolving motor starts, the scrape then blows down the debris to the outlet of the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Debris filters device installed in the circulating water inlet, the debris which with circulating water into and effective diameter is greater than the diameter of the Debris filter hole was blocked on the filter mesh. After the mesh revolving motor starts, the scrape then blows down the debris to the outlet of the
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
碎片的过滤器设备安装在循环水进水口的碎片,这与循环水入和有效直径大于直径的碎片滤洞被冻结的过滤网。
  • 匿名
2013-05-23 12:24:58
残骸过滤在循环水入口安装的设备,与循环水和有效的直径是大于残骸过滤器孔直径被阻拦在过滤器滤网的残骸。 在滤网旋转的马达开始以后,刮然后吹在残骸下对放电凹线的出口,当打开时排出阀,因为压力区别作用残骸与放电管一起安排到系统外部或循环水进水管。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭