|
关注:1
2013-05-23 12:21
求翻译:贴灰饼:用废瓷砖贴在底灰上。灰饼间距一般为1.0~1.6m,上下灰饼用靠尺找好垂直,横向几个灰饼拉线或用靠尺找平。在灰饼砖的棱角处拉立线,在立线上再拴活动水平线,用来控制表面平整。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
贴灰饼:用废瓷砖贴在底灰上。灰饼间距一般为1.0~1.6m,上下灰饼用靠尺找好垂直,横向几个灰饼拉线或用靠尺找平。在灰饼砖的棱角处拉立线,在立线上再拴活动水平线,用来控制表面平整。
问题补充: |
|
2013-05-23 12:21:38
Gray paste cake: with waste on the tiles in the bottom ash. Ash cakes spacing is generally 1.0 ~ 1.6m, up and down the ash cake on foot to find a good use of vertical and horizontal cable or with a few gray cake by leveling feet. Pie in the gray brick edges and corners pull up line up line and then
|
|
2013-05-23 12:23:18
Tips on discarded Tiles : gray cake affixed to the bottom ash. ash cake spaced general 1.0 ~1.6 m, the upper and lower ash cake used depends on foot to find a good vertical and horizontal several gray cake pull line or use make rely on foot. In the dust cake slabs, line the corners, and in a horizon
|
|
2013-05-23 12:24:58
Pastes the ash cake: Pastes with the waste ceramic tile on the bottom ash.The ash cake spacing is generally 1.0~1.6m, about the ash cake with depends on the ruler to find vertical, the crosswise several ash cake back guy or with depends on the ruler to level.Pull in the ash cake brick edges and corn
|
|
2013-05-23 12:26:38
Stick the ash cake: on using waste ceramic tiles affixed to the bottom ash. Lime pie space for 1.0~1.6m, up and down the ash cake on foot found the vertical, horizontal a few gray pie guys or on foot leveling. Lali line at the pie-lime brick corners, then tied the activity level on the State line to
|
|
2013-05-23 12:28:18
Gray paste cake: with waste on the tiles in the bottom ash. Ash cakes spacing is generally 1.0 ~ 1.6m, up and down the ash cake on foot to find a good use of vertical and horizontal cable or with a few gray cake by leveling feet. Pie in the gray brick edges and corners pull up line up line and
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区