当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:必须立即停电撤人,汇报监理和矿有关技术部门,弄清情况并采取措施后方可继续施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
必须立即停电撤人,汇报监理和矿有关技术部门,弄清情况并采取措施后方可继续施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Person must immediately withdraw power to report the technical supervision and mining sectors, and to take measures to clarify the situation before continuing construction.
  • 匿名
2013-05-23 12:23:18
It must be immediately withdrawn outage reporting, supervision and mine in the technology sector, can only clarify the situation and to take measures to continue with the work.
  • 匿名
2013-05-23 12:24:58
Must immediately power cut removes the human, report overseeing with the ore related technology department, after finds out the situation and takes the measure only then to continue to construct.
  • 匿名
2013-05-23 12:26:38
Withdrawn person must immediately power outage, report supervision and mine related technologies sector, clarify and take measures only to construction.
  • 匿名
2013-05-23 12:28:18
Person must immediately withdraw power to report the technical supervision and mining sectors, and to take measures to clarify the situation before continuing construction.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭