求翻译:施工前,项目技术负责人应把安全施工的技术要求和措施告诉专业工程师和专职安全员进行安全技术,专业工程师告诉班组长、班组长再告诉作业人员,并由双方签字确认,安全管理人员负责监督落实是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工前,项目技术负责人应把安全施工的技术要求和措施告诉专业工程师和专职安全员进行安全技术,专业工程师告诉班组长、班组长再告诉作业人员,并由双方签字确认,安全管理人员负责监督落实
问题补充:

  • 匿名
2013-05-23 12:21:38
Pre-construction, the project technical director of security should be the technical requirements of construction and measures to tell the full-time security staff of professional engineers and safety and technical, professional engineer told group leaders, group leaders tell operators, signed by bo
  • 匿名
2013-05-23 12:23:18
Pre-construction projects, Technical Director of construction safety should be the technical requirements and measures tell professional engineers and professional security officers to conduct safety technologies, professional engineer told team supervisor, team supervisor to tell operations staff,
  • 匿名
2013-05-23 12:24:58
Before the construction, the project technology person in charge should carries on the safe construction specification and measure telling specialized engineer and the professional safety officer the safety work, specialized engineer tells Leader Ban, Leader Ban tells the operating personnel again,
  • 匿名
2013-05-23 12:26:38
Before construction, project technical manager should tell the security requirements and measures for the construction of professional engineers and professional security officer to conduct safety technology, professional engineers told the first-line manager, team leader and told workers, and signe
  • 匿名
2013-05-23 12:28:18
Pre-construction, the project technical director of security should be the technical requirements of construction and measures to tell the full-time security staff of professional engineers and safety and technical, professional engineer told group leaders, group leaders tell operators, signed by bo
 
 