|
关注:1
2013-05-23 12:21
求翻译:管道组件焊接后做1.5倍压力测试和焊缝射线探伤检测,要求符合国家压力管道相关标准。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
管道组件焊接后做1.5倍压力测试和焊缝射线探伤检测,要求符合国家压力管道相关标准。
问题补充: |
|
2013-05-23 12:21:38
After welding the pipeline component to do 1.5 times the pressure test and weld-ray flaw detection, pressure piping requirements in line with national standards.
|
|
2013-05-23 12:23:18
Welded pipe components do 1.5 times after pressure testing and weld-ray flaw detection, consistent with national pressure pipe related standards requirements.
|
|
2013-05-23 12:24:58
After the pipeline module welding makes 1.5 time of pressure tests and the welded joint beam crack detection examination, requests to conform to the country pressure piping related standard.
|
|
2013-05-23 12:26:38
Pipe Assembly after soldering to do 1.5 times pressure testing and radiographic detection, related requirements in line with national pressure pipeline standard.
|
|
2013-05-23 12:28:18
After welding the pipeline component to do 1.5 times the pressure test and weld-ray flaw detection, pressure piping requirements in line with national standards.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区