求翻译:工程验收过程无保留书面记录,则缺少证明在建工程转固时点合理性的依据。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
工程验收过程无保留书面记录,则缺少证明在建工程转固时点合理性的依据。
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
Works acceptance process without reservations, the lack of supporting written records in the construction of the fixed time point based on rationality.
|
|
2013-05-23 12:24:58
The acceptance of work process does not have the retention written record, then lacks the proof to construct the project to transfer the solid point in time rational basis.
|
|
2013-05-23 12:26:38
Written record of the engineering acceptance without reservations, the missing proof construction in turn fixed point basis for rationality.
|
|
2013-05-23 12:28:18