|
关注:1
2013-05-23 12:21
求翻译:施工中发包人需对原工程设计进行变更,应及时以书面形式向承包人发出变更通知。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
施工中发包人需对原工程设计进行变更,应及时以书面形式向承包人发出变更通知。
问题补充: |
|
2013-05-23 12:21:38
Construction contract were required to make changes to the original project design, should be promptly issued in writing to the contractor change notification.
|
|
2013-05-23 12:23:18
under construction in the outsourcing of the original design were carried out, and it would be timely to change to the contractor in writing issued a notification of changes.
|
|
2013-05-23 12:24:58
In the construction sends Bao Renxu to carry on the change to the original engineering design, should promptly send out the change notice by the written form to the contractor.
|
|
2013-05-23 12:26:38
Construction of client you want to change the original design, should promptly change a notice in writing to the contractor.
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区