求翻译:施工中发包人需对原工程设计进行变更,应及时以书面形式向承包人发出变更通知。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工中发包人需对原工程设计进行变更,应及时以书面形式向承包人发出变更通知。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction contract were required to make changes to the original project design, should be promptly issued in writing to the contractor change notification.
  • 匿名
2013-05-23 12:23:18
under construction in the outsourcing of the original design were carried out, and it would be timely to change to the contractor in writing issued a notification of changes.
  • 匿名
2013-05-23 12:24:58
In the construction sends Bao Renxu to carry on the change to the original engineering design, should promptly send out the change notice by the written form to the contractor.
  • 匿名
2013-05-23 12:26:38
Construction of client you want to change the original design, should promptly change a notice in writing to the contractor.
  • 匿名
2013-05-23 12:28:18
null
 
 