当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:指上世纪七十年代至现在运行的大部分商业核电 站基本堆型,它们大部门已实现标准化、系列化和批量建设,主要有:PWR、BWR、CANDU是什么意思?

待解决 悬赏分:1 - 离问题结束还有
指上世纪七十年代至现在运行的大部分商业核电 站基本堆型,它们大部门已实现标准化、系列化和批量建设,主要有:PWR、BWR、CANDU
问题补充:

  • 匿名
2013-05-23 12:21:38
Refers to the 1970's to now run the most basic type of reactor commercial nuclear power plants, which have large departments to achieve standardization, serialization and batch building, mainly: PWR, BWR, CANDU
  • 匿名
2013-05-23 12:23:18
"In the 1970s and is now running the vast majority of commercial nuclear power station Basic type, the Sector has achieved their standardization, series and bulk-building, primarily: PWR BWR , , CANDU
  • 匿名
2013-05-23 12:24:58
Refers moves the century for 70's the majority of commercial nuclear power station basic pile which to present, their big department has realized the standardization, the seriation and the batch construction, including: PWR, BWR, CANDU
  • 匿名
2013-05-23 12:26:38
From the late 70 's to now run most of the basic commercial nuclear power station reactor type, which departments have been standardized, serialized and batch build, mainly: PWR, and BWR, and CANDU
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭