当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All excursions requiring bus transportation will require some waiting time. Roll call and a head count is required for loading at both the pick-up location and the theme park. This can result in a wait, varying from 30-60 minutes. Please note: groups requiring a large amount of registration will need to make a reservat是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All excursions requiring bus transportation will require some waiting time. Roll call and a head count is required for loading at both the pick-up location and the theme park. This can result in a wait, varying from 30-60 minutes. Please note: groups requiring a large amount of registration will need to make a reservat
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
所有旅行要求巴士交通将需要一些轮候时间。 进行唱名表决,是需要一点算作装载在上落地点和主题公园。 这可能导致一个等待,从30至60分钟。 请注意:团体需要大量的登记将需要作出一项保留,致电(626)569-2265。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
所有旅行巴士运输要求将都需要一些轮候时间。需要装载上车地点和主题公园两点名和点算人数。这会导致在等待,变从 30-60 分钟。请注意: 需要大量的注册群体将需要通过调用 (626) 569-2265 进行预订。
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭