当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:朗朗电由公共变电所供电,单独计量,需在区域内设10m2配电室一个,10m2电讯机房一个;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
朗朗电由公共变电所供电,单独计量,需在区域内设10m2配电室一个,10m2电讯机房一个;
问题补充:

  • 匿名
2013-05-23 12:21:38
Lang Lang electric power substation by the public, a separate measurement is required in a power distribution room area equipped with 10m2, 10m2 a telecommunications room;
  • 匿名
2013-05-23 12:23:18
electricity power supply, 321-379by separate metering, Public power substation in the region for 10 m2 distribution Room A, 10 m2 telecommunications engineering one;
  • 匿名
2013-05-23 12:24:58
Ringing the electricity by the public transformer substation power supply, alone measures, must suppose 10m2 transformer vault one in the region, 10m2 telecommunication engine room;
  • 匿名
2013-05-23 12:26:38
Long Ping Estate by the public substation power supply, single measurement, needed at the Regional Bureau of 10m2 distribution room one, 10m2 telecom room a;
  • 匿名
2013-05-23 12:28:18
Lang Lang electric power substation by the public, a separate measurement is required in a power distribution room area equipped with 10m2, 10m2 a telecommunications room;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭