当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:乙方接收该铺位时,应当谨慎和适当检查该商铺;如乙方认为该商铺存在缺陷并影响乙方装修,甲乙双方应书面记录该等缺陷并签字确认。甲方应于该商铺交付之日起21日内对缺陷进行必要的修复,修复完毕双方应予书面确认。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
乙方接收该铺位时,应当谨慎和适当检查该商铺;如乙方认为该商铺存在缺陷并影响乙方装修,甲乙双方应书面记录该等缺陷并签字确认。甲方应于该商铺交付之日起21日内对缺陷进行必要的修复,修复完毕双方应予书面确认。
问题补充:

  • 匿名
2013-05-23 12:21:38
B receives the premises, should be careful and check the appropriate shops; if B defects and that the impact of B shop fitting, both parties should be recorded in writing the defects and sign it. Party A shall be delivered to the shop within 21 days from the date of the necessary repair of the defec
  • 匿名
2013-05-23 12:23:18
Party B should be approached with caution, when receiving the shop the shops and appropriate checks; such as Party B believes that the shops are flawed and affected Party B decoration, both parties shall be recorded in writing such defects and confirmed and signed. Party A shall be delivered to the
  • 匿名
2013-05-23 12:24:58
When the second party receives this sleeping place, must discrete and inspects this store suitably; If the second party thought this store existence flaw and affects the second party to repair, armor second grade both sides should the written recording this and so on the flaws and the signature conf
  • 匿名
2013-05-23 12:26:38
When party b receiving the shop should be prudent and appropriate to check the shop if party b see defects and affects party b in the shop decoration, both parties shall record in writing of such defects and signature confirmation. Party a shall from the date of delivery of the shops make necessary
  • 匿名
2013-05-23 12:28:18
B receives the premises, should be careful and check the appropriate shops; if B defects and that the impact of B shop fitting, both parties should be recorded in writing the defects and sign it. Party A shall be delivered to the shop within 21 days from the date of the necessary repair of the defec
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭