|
关注:1
2013-05-23 12:21
求翻译:2006年初,首次将绿色、高效和承载力高的“振捣插筋钻孔压灌桩”应用于该地层后使施工难度大为降低,工效大幅度提高,并对济南地区高层建筑基础施工中尽可能避免抽取地下水和避免钻孔泥浆污染环境起到良好的作用。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
2006年初,首次将绿色、高效和承载力高的“振捣插筋钻孔压灌桩”应用于该地层后使施工难度大为降低,工效大幅度提高,并对济南地区高层建筑基础施工中尽可能避免抽取地下水和避免钻孔泥浆污染环境起到良好的作用。
问题补充: |
|
2013-05-23 12:21:38
In early 2006, the first time, green, efficient and high capacity 'vibrator inserted tendons drilling grouting pile, "applied to the ground after so greatly reduced the difficulty of construction, substantial increase in efficiency, and high-rise building foundation construction in Jinan as much as
|
|
2013-05-23 12:23:18
early 2006, for the first time green, efficient, and can bear the high "次 beading Plug-hole drilling pressure irrigation pile" applies to the construction work is more difficult after the layer substantially reduced, ergonomics, and a substantial increase in Jinan area high-rise buildings in constru
|
|
2013-05-23 12:24:58
At the beginning of 2006, for the first time the green, highly effective and the supporting capacity high “inspire pounds inserts the muscle to drill the hole pressure to fill the pile” to apply after this stratum causes the construction difficulty for to reduce greatly, the work efficiency large sc
|
|
2013-05-23 12:26:38
In early 2006, green for the first time, high efficiency and high bearing capacity of "vibrating Steel Dowel drill hole Grouting pile" should be used for the construction difficulty considerably after the formation, work efficiency increase in Foundation construction of high-rise buildings in Jinan
|
|
2013-05-23 12:28:18
In early 2006, the first time, green, efficient and high capacity 'vibrator inserted tendons drilling grouting pile, "applied to the ground after so greatly reduced the difficulty of construction, substantial increase in efficiency, and high-rise building foundation construction in Jinan as much as
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区