当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:浇注后待铸件凝固完毕,要及时卸除压铁和箱卡,以减少铸件收缩阻力,避免裂纹。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
浇注后待铸件凝固完毕,要及时卸除压铁和箱卡,以减少铸件收缩阻力,避免裂纹。
问题补充:

  • 匿名
2013-05-23 12:21:38
After pouring until the solidification is completed, should be promptly removable pressure iron and box cards, to reduce the casting shrinkage resistance, to avoid cracks.
  • 匿名
2013-05-23 12:23:18
After the note to be casting solidification has been completed, we will provide timely dismount pressure Iron castings and box cards, in order to reduce shrink resistance, avoid cracks.
  • 匿名
2013-05-23 12:24:58
After the casting waits the casting coagulation to finish, wants the prompt dismantle clamp plate and the box card, reduces the casting contraction resistance, avoids the crack.
  • 匿名
2013-05-23 12:26:38
After casting solidification is complete, to promptly remove the weight and box cards in order to reduce the casting shrinkage resistance to avoid cracking.
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭