当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:王铨铭,市市政园林局总工程师,说目前在建的停车设施有3个。江头公园停车楼位于江头西路西侧,采用地上10层垂直升降类机械式停车,停车位285个,投资约2800万元,计划今年底、明年初建成,可以有效缓解江头片区停车位严重短缺的问题。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
王铨铭,市市政园林局总工程师,说目前在建的停车设施有3个。江头公园停车楼位于江头西路西侧,采用地上10层垂直升降类机械式停车,停车位285个,投资约2800万元,计划今年底、明年初建成,可以有效缓解江头片区停车位严重短缺的问题。
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
Mr Ambrose LAU ming, Municipal Gardens Bureau chief engineer, said that the parking facilities are currently under construction in 3 months. river Park parking building is located in the West River Road West, using 10 aboveground floors vertical riser such mechanical parking, parking spaces, 285 inv
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Wang Quan ming, municipal garden Bureau Chief Engineer, said that the current parking facilities with 3 under construction. Jiang Park parking building at River heads west side, 10 floors vertically such mechanical parking, 285 parking spaces, investing about 28 million Yuan, plans of bottom, built
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭