|
关注:1
2013-05-23 12:21
求翻译:In dynamic channel assignment approaches, every data transmission takes place after a channel selection. The channel selection can be measurement based or status based. In measurement based approaches, the communicating parties measure the SINR values on a channel before transmitting. In status-based approaches nodes k是什么意思? 待解决
悬赏分:1
- 离问题结束还有
In dynamic channel assignment approaches, every data transmission takes place after a channel selection. The channel selection can be measurement based or status based. In measurement based approaches, the communicating parties measure the SINR values on a channel before transmitting. In status-based approaches nodes k
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
在动态渠道转让办法,每一个数据传输的渠道的选择后进行。 频道的选择可以为根据来衡量或基础上的地位。 在衡量标准为基础的方法,该通讯方sinr价值的措施对一个渠道转递前。 在地位为基础的办法保持轨道节点的渠道的地位,例如繁忙或空闲,根据收到的控制数据包。
|
|
2013-05-23 12:24:58
在动态渠道任务方法,每数据传输在通道选择以后发生。 通道选择可以是基于的测量基于的或状态。 在基于的测量接近, SINR在渠道重视在传送之前的沟通的党措施。 在基于状态的方法结根据收到的控制小包记录渠道的状况,例如繁忙或无所事事。
|
|
2013-05-23 12:26:38
在动态信道分配办法,每个数据传输发生后通道选择。通道选择可以测量的或基于状态。基于测量的方法,在通信的双方在传输之前测量通道上的最优值。基于状态的方法中节点跟踪的地位的渠道,例如繁忙或空闲状态,依法接收的控制数据包。
|
|
2013-05-23 12:28:18
null
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区