|
关注:1
2013-05-23 12:21
求翻译:表3给出夏季某日负荷水平较高时刻两断面的ATC计算结果。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
表3给出夏季某日负荷水平较高时刻两断面的ATC计算结果。
问题补充: |
|
2013-05-23 12:21:38
Table 3 shows the daily load of a high level of summer time two sections of the ATC calculation.
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Table 3 gives the summer some day load level high time two cross sections the ATC computed results.
|
|
2013-05-23 12:26:38
Table 3 gives a daily load levels are higher in the summer time two sections of ATC calculation.
|
|
2013-05-23 12:28:18
Table 3 shows the daily load of a high level of summer time two sections of the ATC calculation.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区