当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:When a load change occurs in any area, a new steady-state operation can be obtained only after the power output of every turbine-generating unit in the interconnected system reaches a constant value. This occurs only when all reference power settings are zero, which in turn occurs only when the ACE of every area is zer是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When a load change occurs in any area, a new steady-state operation can be obtained only after the power output of every turbine-generating unit in the interconnected system reaches a constant value. This occurs only when all reference power settings are zero, which in turn occurs only when the ACE of every area is zer
问题补充:

  • 匿名
2013-05-23 12:21:38
当负载变化发生在任何地方,一个新的稳态运行后才能获得的互联系统中的每个涡轮发电机的单位功率输出达到一个恒定值。出现这种情况,只有当所有参考电源设置是零,这反过来又发生,只有当每一个领域的ACE是零。此外,ACE是在每一个领域,只有当ΔP和ΔF零零。因此,在稳定状态下,无论是利物浦的目标是满意的。
  • 匿名
2013-05-23 12:23:18
当一个负载变化发生在任何地区,一个新稳定国家行动只可以获得的权力后的产出每个涡轮机发电单位的相互关联的系统达一变价值。 这只会出现在所有参考电源设置为零,这反过来又只会出现当ACE的每一个领域是零。 此外,在每一个领域内的ACE是零只有在δp和δf是零。 因此,在稳定国,两个覆盖率目标是感到满意的。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
任何地区负荷变化时,互连系统中每个水轮发电机组的输出功率达到恒定值后,才可以获得新的稳态运行。仅当所有引用电源设置都是零,这反过来的每个区域的王牌是零时,才会出现时,将发生这种情况。此外,ACE 是零,在每个领域中的只有 Δp 和 Δf 都是零。因此,在稳定状态,满足这两个消失模目标。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭