|
关注:1
2013-05-23 12:21
求翻译:填筑过程中,施工人员必须保证观测仪器埋设、观测电缆与测量工作的正常进行,并保护埋设仪器和测量标志完好。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
填筑过程中,施工人员必须保证观测仪器埋设、观测电缆与测量工作的正常进行,并保护埋设仪器和测量标志完好。
问题补充: |
|
2013-05-23 12:21:38
Filling process, the construction must ensure that the laying of observation instruments, observation and measurement cables work normal, and to protect the buried instruments and survey marks intact.
|
|
2013-05-23 12:23:18
reclamation, construction personnel in the process must ensure that observation equipment laying cables, and surveying work, observation, and to protect the normal planted apparatus and survey mark is intact.
|
|
2013-05-23 12:24:58
In the reclamation process, the constructor must guarantee the off-carriage instrument embedment, observes the electric cable and the surveying work carries on normally, and protects the embedment instrument and the survey mark is complete.
|
|
2013-05-23 12:26:38
In the process of filling and construction staff must ensure that the cable observation instrument Embedment, observation and measurement of the normal progress of the work, and laying instruments and survey mark protection intact.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区