当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2009年9月 在葛洲坝与三峡水电厂专业见习,主要见识二江电厂跟大江电厂开关站的主接线形式与开关设备。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2009年9月 在葛洲坝与三峡水电厂专业见习,主要见识二江电厂跟大江电厂开关站的主接线形式与开关设备。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
The Gezhouba September 2009 professional work experience with 3 gorges hydropower plants, the main insights with OE 2 River power plant switching station power plant forms the main switchboard operators and switching equipment.
  • 匿名
2013-05-23 12:24:58
In September, 2009 in Gezhou Dam and Three Gorges Hydroelectric power plant specialized application, main experience two river power plants with big river power plant switching house main wiring form and switching gear.
  • 匿名
2013-05-23 12:26:38
September 2009 in gezhouba and three gorges hydropower plant professional work experience, mainly seen two River power plant with main-line form of dajiang switching stations and switchgear.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭