|
关注:1
2013-05-23 12:21
求翻译:Develops the Master Programme in consultation with the Client and the lead consultant. The programme showing the overall time frames for all phases of development will be used as the baseline to track the progress of the project.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Develops the Master Programme in consultation with the Client and the lead consultant. The programme showing the overall time frames for all phases of development will be used as the baseline to track the progress of the project.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区