当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:承包商应指定堆放余土的地点,以及从建筑工区清出建筑垃圾的通道是什么意思?

待解决 悬赏分:1 - 离问题结束还有
承包商应指定堆放余土的地点,以及从建筑工区清出建筑垃圾的通道
问题补充:

  • 匿名
2013-05-23 12:21:38
Contractor shall designate the location of earth piled over, and construction waste from the construction work area and clear the channel
  • 匿名
2013-05-23 12:23:18
Yu and piling contractor should specify the location, as well as from Construction Work Area cleared the corridor building garbage
  • 匿名
2013-05-23 12:24:58
The contractor should assign to pile up Yu Tu the place, as well as is clear construction trash from the construction work area the channel
  • 匿名
2013-05-23 12:26:38
The contractor shall specify stacking Yu Tu locations, as well as from construction waste in construction work area clear channel
  • 匿名
2013-05-23 12:28:18
The contractor shall specify stacking Yu Tu locations, as well as from construction waste in construction work area clear channel
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭