求翻译:不属于包干范围内的设计变更等而增加工程量是什么意思?

待解决 悬赏分:1 - 离问题结束还有
不属于包干范围内的设计变更等而增加工程量
问题补充:

  • 匿名
2013-05-23 12:21:38
Lump sum does not belong within the scope of engineering design changes such as increasing the amount of
  • 匿名
2013-05-23 12:23:18
Lump sum is not within the scope of design changes such as increased volume works
  • 匿名
2013-05-23 12:24:58
Does not belong is responsible until completion in the scope design change and so on to increase the resilience
  • 匿名
2013-05-23 12:26:38
Do not fall within the responsibility of design changes such as increased quantities
  • 匿名
2013-05-23 12:28:18
Do not fall within the responsibility of design changes such as increased quantities
 
 