求翻译:基础施工完后,基坑及上土体均应及时回填,回填土采用素土分层夯实,压实系数不小于0.94。在基础回填完成前,不得进行上部结构的施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基础施工完后,基坑及上土体均应及时回填,回填土采用素土分层夯实,压实系数不小于0.94。在基础回填完成前,不得进行上部结构的施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
After construction of basis and at the Commonwealth Foundation pit shall timely backfilling soil quality, and back to filling used stratified solidify compacted, Coefficient is not less than 0.94 . Backfilling the Foundation shall not be carried out prior to the completion of the superstructure cons
  • 匿名
2013-05-23 12:24:58
After the foundation constructs, the hole excavated for building foundation and on the soil body should the prompt backfill, return to the earth fill to use the element earth lamination ramming, the compacting factor is not smaller than 0.94.Completes front the foundation backfill, does not have to
  • 匿名
2013-05-23 12:26:38
Foundation construction finishes, and Foundation pit and soil should be timely on backfill, effects of soil layer compaction of backfill soil, compaction coefficient of not less than 0.94. Foundation backfilled prior to completion of construction of the superstructure shall be carried out.
  • 匿名
2013-05-23 12:28:18