|
关注:1
2013-05-23 12:21
求翻译:基础施工时,应组织相关人员进行验槽,如发现地基土与勘查报告有差异时,应及时通知地勘及设计单位进行处理。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
基础施工时,应组织相关人员进行验槽,如发现地基土与勘查报告有差异时,应及时通知地勘及设计单位进行处理。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
When construction of basis should be organized, and relevant personnel, such as post-mortem revealed that foundation and trough with prospecting, when there is a difference report shall promptly notify geological survey and design unit for processing.
|
|
2013-05-23 12:24:58
When foundation construction, should organize the correlation personnel to carry on examines the trough, when the discovery foundation soil and the investigation report has the difference, should inform to compare promptly and the designing department carries on processing.
|
|
2013-05-23 12:26:38
Foundation construction, should organize personnel to tank inspection, such as the discovery and exploration of Foundation soil reporting when there is a difference, shall promptly notify the geological prospecting and design unit for processing.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区