当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:跟多位坝区资深水利电力工程师从事电站建设与运行全方位的学习,学习认识实际高压设备的运行特点,包括目前先进的电力设备技术等。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
跟多位坝区资深水利电力工程师从事电站建设与运行全方位的学习,学习认识实际高压设备的运行特点,包括目前先进的电力设备技术等。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
With more than one pa district senior Water Conservancy and Electric Power Plant engineers engaged in building and running the full range of learning, learning about the actual high-pressure equipment, including the current operational features advanced power equipment technology.
  • 匿名
2013-05-23 12:24:58
Is engaged in the power plant with multi-dam area senior water conservation electric power engineer to construct and to move the omni-directional study, the study knows the actual high pressure unit the movement characteristic, including at present advanced power equipment technology and so on.
  • 匿名
2013-05-23 12:26:38
With a number of senior water resources and electric engineers engaged in power plant construction in the dam area and run a full range of learning, learning and understanding the actual running characteristics of high voltage equipment, including the current state of the art power equipment technol
  • 匿名
2013-05-23 12:28:18
With a number of senior water resources and electric engineers engaged in power plant construction in the dam area and run a full range of learning, learning and understanding the actual running characteristics of high voltage equipment, including the current state of the art power equipment technol
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭