当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:梁侧附加腰筋及吊筋规格详见SG-0701;图中标注“——”的梁按井字梁构造施工, 相交处两侧双向各附加3‚8@50箍筋是什么意思?

待解决 悬赏分:1 - 离问题结束还有
梁侧附加腰筋及吊筋规格详见SG-0701;图中标注“——”的梁按井字梁构造施工, 相交处两侧双向各附加3‚8@50箍筋
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Mr Leung added side waist band and cable tendons specifications for details, see SG; map - 0701 marked " - " Liang Liang construction works by Tseng cross intersection of the two sides, two-way the additional 3 8 @ 50 binder ‚
  • 匿名
2013-05-23 12:24:58
The Liang side attachment back muscles and hang the muscle specification to for details see SG-0701; In the chart labels “- -” Liang according to the well character Liang structure construction, the intersect point both sides bidirectional attaches 3 ‚ 8@50 stirrups respectively
  • 匿名
2013-05-23 12:26:38
Additional lumbar rib and hanging beam side rib specification see SG-0701; callout in the figure "--" the beam by beam building construction, two sides of the intersection of additional 3 bi-directional 8@50 Stirrup
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭