当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本文针对近期技术改造工程需要升高杆塔,提高线路导线对地距离,满足交叉跨越距离的要求,通过此方法缩短了施工周期,为电网的安全运行提供了保障是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本文针对近期技术改造工程需要升高杆塔,提高线路导线对地距离,满足交叉跨越距离的要求,通过此方法缩短了施工周期,为电网的安全运行提供了保障
问题补充:

  • 匿名
2013-05-23 12:21:38
This paper focuses on the recent technical innovation project requires elevated Tower, improving the lines on the ground, meet the requirements for crossing distances, through this method shortens the construction period, for the safe operation of power network has provided a guarantee
  • 匿名
2013-05-23 12:23:18
This article in response to immediate needs technical renovation project to improve circuit wire towers rising to meet cross-cutting distance, distance, and the request through the ways to shorten the construction cycle for grid provided a guarantee of safe operation
  • 匿名
2013-05-23 12:24:58
This article will need to elevate the pole tower in view of the near future technological transformations project, will enhance the line conductor to be away from to the place, satisfies the overlapping spanning distance the request, reduced the construction cycle through this method, was the electr
  • 匿名
2013-05-23 12:26:38
This paper focuses on the recent technical innovation project requires elevated Tower, improving the lines on the ground, meet the requirements for crossing distances, through this method shortens the construction period, for the safe operation of power network has provided a guarantee
  • 匿名
2013-05-23 12:28:18
In this paper, the recent increase in pole technological transformation projects need to improve the line wire-to-ground distance, the distance to meet the requirements of cross-cutting by shortening the construction period of this method for the safe operation of the grid provided a guarantee
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭