|
关注:1
2013-05-23 12:21
求翻译:Party B shall deliver the finished products to Party A at London at the former’s own expense and risk not later than ten (10) days after the end of each calendar quarter, and shall advise Party A by telex, within three (3) days after loading, of the quantity, vessel’s name, port of shipment, date, estimated date of arr是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Party B shall deliver the finished products to Party A at London at the former’s own expense and risk not later than ten (10) days after the end of each calendar quarter, and shall advise Party A by telex, within three (3) days after loading, of the quantity, vessel’s name, port of shipment, date, estimated date of arr
问题补充: |
|
2013-05-23 12:21:38
乙方应提供的成品给甲方,一个在伦敦前者的自己的费用和风险不迟于十个(10)天每个日历季度结束后,并应告知甲方一个以用户电报在三(3)天,后装载的数量,船名,装运港,日,估计抵达目的地和其他有关货物的信息日期。
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
乙方应交付甲方在前者的费用和风险,不迟于每个日历季度结束后十个 10 天伦敦成品,并须告知甲方通过电传、 装载、 量、 后三 3 天内船只的名称、 按端口的装运、 日期、 预计的到达目的地的日期和其他资料装运。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区