|
关注:1
2013-05-23 12:21
求翻译:The DPM shall have lapped or sealed joints and be brought out to the slab periphery, so as to be under the superstructure and any subsequent internal lining, to provide suitable moisture protection.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The DPM shall have lapped or sealed joints and be brought out to the slab periphery, so as to be under the superstructure and any subsequent internal lining, to provide suitable moisture protection.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区