当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:中标后,3日内中标人提供工艺管线布置图以及满足工艺设计的带控制点的工艺流程图,仪表技术规格表、仪表安装位置图、设备平立面布置图、土建基础条件图等。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
中标后,3日内中标人提供工艺管线布置图以及满足工艺设计的带控制点的工艺流程图,仪表技术规格表、仪表安装位置图、设备平立面布置图、土建基础条件图等。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
3 days after the successful bidder, the successful bidder pipe layout provided technical design as well as meet with the number of control points of flow charts, technical specifications and meter installation location map table, instrumentation, equipment, the layout, construction based conditions
  • 匿名
2013-05-23 12:24:58
After is selected, in 3rd is selected the human to provide the craft pipeline general arrangement as well as satisfies the technological design the belt control point flow chart, the measuring appliance technology specification table, the measuring appliance installs the site plan, the equipment set
  • 匿名
2013-05-23 12:26:38
After the bid, the winning bidder in the 3rd provided process piping layout with control points and meet the technology design process of, instrument technical specification sheets, instrument installation location maps, equipment layout of flat facades, civil infrastructure, and so on.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭