求翻译:给料机出厂前已进行时间不少于四小时的空载试车,设备在现场安装调整完毕后应进行短期试运转,以配伍生产流量;调节料仓闸门的开度,改变料层厚度,达到调节给料机生产率的目的。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
给料机出厂前已进行时间不少于四小时的空载试车,设备在现场安装调整完毕后应进行短期试运转,以配伍生产流量;调节料仓闸门的开度,改变料层厚度,达到调节给料机生产率的目的。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Before the feeding engine exwork has carried on the time many in four hour idling tests run, the equipment finished after the scene installment adjustment should carry on the short-term test run, blends the production current capacity; The adjustment bunker strobe opening, change material level thic
|
|
2013-05-23 12:26:38
Feeder had no less than four hours before delivery of the no-load test, equipment installation and adjustment at the scene after the test run on a short-term basis, so as to compatibility of production flow; regulation of hopper gate opening, changing thickness of materials, to adjust the feeder pro
|
|
2013-05-23 12:28:18