|
关注:1
2013-05-23 12:21
求翻译:14.1 The total project costs are estimated at USD $ 1,225.37m to be financed through both equity and term loan as described in the Table below:是什么意思?![]() ![]() 14.1 The total project costs are estimated at USD $ 1,225.37m to be financed through both equity and term loan as described in the Table below:
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区