|
关注:1
2013-05-23 12:21
求翻译:展厅防潮,地暖,保护层施工计划今日起6天内完成。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
展厅防潮,地暖,保护层施工计划今日起6天内完成。
问题补充: |
|
2013-05-23 12:21:38
Showroom moisture-proof, floor heating, protective layer construction scheduled for completion within 6 days from today.
|
|
2013-05-23 12:23:18
The gallery layer of protection, protection against moisture and heat into construction plans starting today completed within 6 days.
|
|
2013-05-23 12:24:58
The exhibition hall is moisture-proof, warm, the protector construction plan today gets up in 6 day to complete.
|
|
2013-05-23 12:26:38
Showroom moisture-proof, floor heating, protective layer construction scheduled for completion within 6 days from today.
|
|
2013-05-23 12:28:18
Showroom moisture-proof, floor heating, protective layer construction scheduled for completion within 6 days from today.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区