|
关注:1
2013-05-23 12:21
求翻译:SSBA表示车间散热器支管安装事宜原计划剔墙安装,现因墙体要加厚,MCC可敷设墙面。具体方案请双方会后仔细协商拟定。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
SSBA表示车间散热器支管安装事宜原计划剔墙安装,现因墙体要加厚,MCC可敷设墙面。具体方案请双方会后仔细协商拟定。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Workshop radiators SSBA said that the installation of wall-the original plan, is now installed in wall to wall thickening MCC can be laid. Specific programs will be invited after both sides carefully prepared in consultation.
|
|
2013-05-23 12:24:58
SSBA expressed the workshop radiator branch installs the matters concerned original plan to pick out the wall installment, because presently the wall must add thick, MCC may lay the wall surface.After the concrete plan asks the bilateral meeting the careful consultation to draw up.
|
|
2013-05-23 12:26:38
Tick SSBA workshop radiator pipes installed originally planned wall installation, wall thickening, MCC can be laying of walls. After the specific programmes, both sides will be carefully prepared in consultation.
|
|
2013-05-23 12:28:18
Tick SSBA workshop radiator pipes installed originally planned wall installation, wall thickening, MCC can be laying of walls. After the specific programmes, both sides will be carefully prepared in consultation.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区