当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:6.8.2.2 測試治具:除了每3個月由工程師校驗外,每班生產前由作業員進行點檢,作業方式參照各SOP,並紀錄於日點檢表.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
6.8.2.2 測試治具:除了每3個月由工程師校驗外,每班生產前由作業員進行點檢,作業方式參照各SOP,並紀錄於日點檢表.
问题补充:

  • 匿名
2013-05-23 12:21:38
6.8.2.2 Test fixture: In addition to every three months by the engineers check, the first class production conducted by the operator point inspection, practices refer to the SOP, and record on the day of Inspection form.
  • 匿名
2013-05-23 12:23:18
6.8 2 2 Test Tools: Apart from every three months by the engineers calibration, class production by the operations of inspection, modus operandi the SOP light, and records in the Japanese inspection table.
  • 匿名
2013-05-23 12:24:58
6.8.2.2 test fixture: Besides 了 every 3 months verify by engineer before, each class produces enters 行 the inspection by the operator, the work way 參 according to each SOP, and Ji 錄yu date checking list.
  • 匿名
2013-05-23 12:26:38
6.8.2.2 test fixture: not including 了 engineers check every 3 months, before production by workers do point in each class, and job 參 according to the SOP, and JI 錄 on day inspection table.
  • 匿名
2013-05-23 12:28:18
6.8.2.2 测试治具:除了每3个月由工程师校验外,每班生产前由作业员进行点检,作业方式參照各SOP,并纪錄于日点检表.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭