当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:根据工程地质纵、横断面图,基坑侧壁主要由1-1杂填土、1-2素填土、3-1-1新黄土(水上)、3-1-2新黄土(水下)、3-2古土壤、4-1-2-1老黄土(水下)、4-1-2-2老黄土(水下)及4-4粉质黏土构成。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据工程地质纵、横断面图,基坑侧壁主要由1-1杂填土、1-2素填土、3-1-1新黄土(水上)、3-1-2新黄土(水下)、3-2古土壤、4-1-2-1老黄土(水下)、4-1-2-2老黄土(水下)及4-4粉质黏土构成。
问题补充:

  • 匿名
2013-05-23 12:21:38
According to geological vertical cross-sections, pit wall mainly by 1-1, 1-2 miscellaneous fill plain fill, 3 -1-1 new loess (water), 3-1-2 new loess (underwater ), 3-2, 4 paleosol -1-2-1 old loess (underwater), 4 -1-2-2 old loess (underwater) and 4-4 silty clay composition.
  • 匿名
2013-05-23 12:23:18
Based on the engineering geological trim, przekroj pit wall chart, mainly by 1 -1, 1 -2 quality miscellaneous filling filling, 3 - 1 - 1 new loess (water), 3 - 1 - 2 new loess (underwater), 3 -2, 4 -1 ancient soil - 2 - 1 old loess (underwater), 4 - 1 - 2 - 2 old loess (underwater) and 4 - 4 clay po
  • 匿名
2013-05-23 12:24:58
According to the engineering geology vertical, the cross section chart, the hole excavated for building foundation sidewall mainly by 1-1 mixed earth fill, 1-2 element earth fill, 3-1-1 new loess (aquatic), 3-1-2 new loess (submarine), 3-2 ancient soil, 4-1-2-1 old loess (submarine), 4-1-2-2 old loe
  • 匿名
2013-05-23 12:26:38
Based engineering geological longitudinal, cross, Foundation pit side mainly composed of 1-1 mixed backfill soil, loess in new 1-2 effect of fill, 3-1-1 (aquatic), new loess 3-1-2 (underwater) ancient,: 4-1 old loess soils, 3-2 (underwater) and: 4-1 old loess (underwater) and 4-4 silty clay composit
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭