求翻译:厂内、外临时便道:轨枕厂内设6m宽便道,采用简单土石路面,少量采用混凝土路面,预计铺设5km道路。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
厂内、外临时便道:轨枕厂内设6m宽便道,采用简单土石路面,少量采用混凝土路面,预计铺设5km道路。
问题补充:

  • 匿名
2013-05-23 12:21:38
Inside and outside plant detour: sleeper factory headed by 6m wide access road, using simple soil-stone pavement, a small amount of concrete, pavement, is expected to lay the 5km road.
  • 匿名
2013-05-23 12:23:18
In the factory, the temporary sidewalk: sleeper factory located within 6 m wide sidewalk, use a simple rock, with a small amount using concrete pavement surfaces, it is expected that 5 km paved road.
  • 匿名
2013-05-23 12:24:58
Factory inside and outside temporary access road: In the railroad tie factory supposes the 6m width access road, uses the simple earth rock road surface, uses the coagulation earthen road pavement few, estimated lays down the 5km path.
  • 匿名
2013-05-23 12:26:38
Inside and outside plant detour: sleeper factory headed by 6m wide access road, using simple soil-stone pavement, a small amount of concrete, pavement, is expected to lay the 5km road.
  • 匿名
2013-05-23 12:28:18
Inside and outside plant detour: sleeper factory headed by 6m wide access road, using simple soil-stone pavement, a small amount of concrete, pavement, is expected to lay the 5km road.
 
 