当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:We need to know what is your cut-off inventory for incoming raw materials from Syslink, drop ship from Stocko and Sun Fai. Meanwhile, what is your cut-off for Fgs shipment back to Syslink as well as FT Industrial. As mentioned before, we need the inventory report based by models and not based on projects.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
We need to know what is your cut-off inventory for incoming raw materials from Syslink, drop ship from Stocko and Sun Fai. Meanwhile, what is your cut-off for Fgs shipment back to Syslink as well as FT Industrial. As mentioned before, we need the inventory report based by models and not based on projects.
问题补充:

  • 匿名
2013-05-23 12:21:38
我们需要知道什么是切断Syslink传入原材料库存,下降STOCKO和新辉船舶。同时,什么是您的切断FGS装运以及金融时报工业Syslink。如前所述,我们需要的模型,而不是基于项目的库存报告。
  • 匿名
2013-05-23 12:23:18
我们需要知道什么是你禁产清单从syslink原料,下降至船舶STOCKO和新辉。 另外,你有什么禁产为研制运回syslink以及FT工业。 如前所述,我们需要为基础的清单报告的模式并不是根据项目。
  • 匿名
2013-05-23 12:24:58
我们需要知道什么是您的切除存货为接踵而来的原材料从Syslink,下落船从Stocko和太阳Fai。 同时,什么是您的切除为Fgs发货回到Syslink并且FT工业。 如上所述,我们需要根据项目根据由模型和没的存货报告。
  • 匿名
2013-05-23 12:26:38
我们需要知道什么是你截止库存为 Syslink、 Stocko 和太阳辉放船从原材料。与此同时,什么是你 Fgs 运回 Syslink,以及金融时报 》 工业截止。正如前面提到的我们需要库存报告基于模型并不是基于项目。
  • 匿名
2013-05-23 12:28:18
我们需要知道什么是你截止库存为 Syslink、 Stocko 和太阳辉放船从原材料。与此同时,什么是你 Fgs 运回 Syslink,以及金融时报 》 工业截止。正如前面提到的我们需要库存报告基于模型并不是基于项目。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭