|
关注:1
2013-05-23 12:21
求翻译:3.对于除险加固土石坝工程,防渗墙的深度除地基部分与新建土石坝相同外,还应根据防渗墙布置的轴线情况,加上穿过坝体部分的深度。二项之和为防渗墙的深度。是什么意思?![]() ![]() 3.对于除险加固土石坝工程,防渗墙的深度除地基部分与新建土石坝相同外,还应根据防渗墙布置的轴线情况,加上穿过坝体部分的深度。二项之和为防渗墙的深度。
问题补充: |
|
2013-05-23 12:21:38
3. for the reinforcement of Earth-rock dam engineering, depth in addition to ground part of the cut-off wall outside the same as the new Earth-rock dam, also should be based on anti-seepage wall arrangement of axes, and through the depth of the part of the dam. And on the second item of cutoff wall
|
|
2013-05-23 12:23:18
|
|
2013-05-23 12:24:58
|
|
2013-05-23 12:26:38
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区