求翻译:f 控制柜及要求中提到“控制系统应能够与污水处理厂中心控制系统的PLC配套联接。”请问,要求采用哪种方式连接?可否采用硬接线接口?是什么意思?

待解决 悬赏分:1 - 离问题结束还有
f 控制柜及要求中提到“控制系统应能够与污水处理厂中心控制系统的PLC配套联接。”请问,要求采用哪种方式连接?可否采用硬接线接口?
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
F * control cabinet and requested that the reference to "control system should be able to control center system and sewage treatment plant of PLC Supporting links. " asked, may I ask what manner connections? hard wire interface can be used?
  • 匿名
2013-05-23 12:24:58
f In the control cubicle and the request mentions “the control system to be supposed to be able and the sewage treatment plant center control system PLC necessary joint.” Ask that, which way connection the request does use? Whether or not uses the hard wiring connection?
  • 匿名
2013-05-23 12:26:38
F control cabinet and the requirements mentioned in the "control system of sewage treatment plant and should be able to center the PLC control system of coupling. "May I ask, asking what kind of connection? Will the hard wiring interface?