当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:b.将线圈移至被测管道的上方1-1.2米处,调节线圈上的支撑架9,是线圈平面和铁管道5基本平行;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
b.将线圈移至被测管道的上方1-1.2米处,调节线圈上的支撑架9,是线圈平面和铁管道5基本平行;
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
B. The coil moves on to the detection of the 1 -channel 1.2 m, and adjust the supporting structure 9 coil, coil, is flat and iron pipes 5 basic parallel;
  • 匿名
2013-05-23 12:24:58
b. moves the coil to was measured pipeline the place above 1-1.2 meters place, in the regulating coil carriage 9, is the coil plane and the hard pipeline 5 basic parallel;
  • 匿名
2013-05-23 12:26:38
B. moving coil to be above the pipeline logging 1-1.2 m, adjustable coil support frame on 9, plane parallel to the 5 Basic iron pipe was coil;
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭