当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:However,if a shotcrete-lined tunnel has a section that is nearly circular or oval with no irregularities,and if there is no adjacent surface or subsurface structure interacting with the tunnel,then traditional ground-lining interaction methods can be used for design.Indeed,the closed-form ground-lining interaction equa是什么意思?

待解决 悬赏分:1 - 离问题结束还有
However,if a shotcrete-lined tunnel has a section that is nearly circular or oval with no irregularities,and if there is no adjacent surface or subsurface structure interacting with the tunnel,then traditional ground-lining interaction methods can be used for design.Indeed,the closed-form ground-lining interaction equa
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
然而,如果一个喷浆混凝土方法-内衬隧道有一节,是近通函或椭圆形,没有违规行为,如果没有邻近表面或地下结构与互动的隧道,传统地面钓互动方法可用于设计。的确,非公开形式地面衬方程式互动提供一个审慎检查数值模式。
  • 匿名
2013-05-23 12:24:58
然而,如果一个shotcrete被排行的隧道有是几乎圆或长圆形没有不规则性的一个部分,并且,如果没有互动与隧道的毗邻表面或表层下结构,然后传统地面衬里互作用方法可以为设计使用。的确,封闭形状地面衬里互作用等式在数字塑造提供一张慎密支票。
  • 匿名
2013-05-23 12:26:38
但是,如果隧道喷射混凝土衬有一个部分,是近圆形或椭圆形的任何违规行为,并且有隧道与交互不相邻的表面或地下结构,然后传统地面衬交互方法也可以使用设计。事实上,闭式地面内衬相互作用方程提供数值模拟审慎检查。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭