当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:因工程队施工,综合楼停电的原因,原定于5月20日上午8:00在综合楼电子教室的计算机能力考试延期至5月25日上午8:30在新教学楼多媒体教室举行。原考场号及坐位号不变,望相关考生勿误!是什么意思?

待解决 悬赏分:1 - 离问题结束还有
因工程队施工,综合楼停电的原因,原定于5月20日上午8:00在综合楼电子教室的计算机能力考试延期至5月25日上午8:30在新教学楼多媒体教室举行。原考场号及坐位号不变,望相关考生勿误!
问题补充:

  • 匿名
2013-05-23 12:21:38
Engineering team for construction, comprehensive building power of reason, scheduled for 8:00 am on May 20 in integrated floor electronic classroom computer proficiency examinations postponed to May 25 at 8:30 am in the multimedia classrooms at new school building. The original number and seat numbe
  • 匿名
2013-05-23 12:23:18
In 0730, the building construction of power outages, scheduled for May 20, 8:00 a.m. in the integrated building E-classroom computers capacity extension to test on 25 May, 8:30 a.m. in the new classroom building held multimedia classrooms. Of the original exam and seating of relevant candidates rema
  • 匿名
2013-05-23 12:24:58
Because of the engineer brigade construction, the comprehensive building power cut reason, is decided in May on 20 8:00 in the morning 8:30 to hold in the morning originally in the synthesis building electron classroom computer capacity test extension to May 25 in the new classroom building multimed
  • 匿名
2013-05-23 12:26:38
Construction of the engineering team, building power outage causes, scheduled for May 20 in building electronic classroom computer proficiency test postponed to May 25 in the new teaching building multimedia classroom. Original unchanged, examination room, and sitting position, hope candidates not t
  • 匿名
2013-05-23 12:28:18
Construction of the engineering team, building power outage causes, scheduled for May 20 in building electronic classroom computer proficiency test postponed to May 25 in the new teaching building multimedia classroom. Original unchanged, examination room, and sitting position, hope candidates not t
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭