当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:为保证白芒坝龙潭下游河道通畅,避免山洪汛期造成损失,签约方须整治疏通下游至黔江入口河道,并做好绿化防洪工程。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为保证白芒坝龙潭下游河道通畅,避免山洪汛期造成损失,签约方须整治疏通下游至黔江入口河道,并做好绿化防洪工程。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
In order to guarantee Bai Mangba the Longtan downstream river course is unobstructed, avoids the mountain torrent flood season causing the losses, the signing side must renovate the unblock downstream to the Qianjiang entrance river course, and completes the afforestation flood-control works.
  • 匿名
2013-05-23 12:26:38
Order to guarantee the patency of the lower Pak Mong dam of Longtan, avoiding Flash flood flood losses, signatories would be regulation dredging downstream to qianjiang Portal River and flood control engineering of green.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭