当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:通过分析可知,达州地方电网是受端系统,到2015年,整个达州地方电网的丰期电力缺口任达到120MW。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
通过分析可知,达州地方电网是受端系统,到2015年,整个达州地方电网的丰期电力缺口任达到120MW。
问题补充:

  • 匿名
2013-05-23 12:21:38
Through analysis, Florida is the local power grid system by the end of 2015, the local power grid throughout Florida abundance of any period of power shortage reached 120MW.
  • 匿名
2013-05-23 12:23:18
It can be seen through the analysis, state and local governments, and to achieve power grids is the backend systems, in 2015, the entire power grid of Toyota, state and local governments for any electricity shortfall MW reached 120.
  • 匿名
2013-05-23 12:24:58
May know through the analysis, reaches the state place electrical network is carried the system, to 2015, entire reaches the state place electrical network the abundant time electric power gap no matter what achieves 120MW.
  • 匿名
2013-05-23 12:26:38
By analyzing, dazhou local power network is the receiver system, by 2015, dazhou Feng period of local power network as a whole either reach a 120MW electricity shortfall.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭